Revision history of "The two-machine open-shop problem with unit-time operations and time delays to minimize the makespan" (Q1043332)
From MaRDI portal
Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.