Revision history of "A novel integrated condition-based maintenance and stochastic flexible job shop scheduling problem: simulation-based optimization approach" (Q1730479)

From MaRDI portal

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

18 July 2024

19 March 2024

5 March 2024

1 February 2024

26 July 2023