Revision history of "Two-agent scheduling on a bounded series-batch machine to minimize makespan and maximum cost" (Q2081468)
From MaRDI portal
Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.