Revision history of "Pareto-scheduling with family jobs or ND-agent on a parallel-batch machine to minimize the makespan and maximum cost" (Q2144217)

From MaRDI portal

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

29 July 2024

19 March 2024

5 March 2024

2 February 2024

31 July 2023