Revision history of "Two-machine flow shop scheduling with an operator non-availability period to minimize makespan" (Q2175049)
From MaRDI portal
Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.