Revision history of "A heuristic based on mathematical programming for a lot-sizing and scheduling problem in mold-injection production" (Q2178114)

From MaRDI portal

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

25 July 2024

22 July 2024

20 March 2024

5 March 2024

2 February 2024

1 August 2023