Revision history of "An approximation scheme for minimizing the makespan of the parallel identical multi-stage flow-shops" (Q2636494)
From MaRDI portal
Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.