Revision history of "Minimising total flow-time on two parallel machines with planned downtimes and resumable jobs" (Q3163792)
From MaRDI portal
Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.