Revision history of "Primary-secondary bicriteria scheduling on identical machines to minimize the total completion time of all jobs and the maximum T-time of all machines" (Q391787)
From MaRDI portal
Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.