Revision history of "Joint optimization of preventive maintenance and flexible flowshop sequence-dependent group scheduling considering multiple setups" (Q5059220)
From MaRDI portal
Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.