Revision history of "Single-machine scheduling with deteriorating jobs and setup times to minimize the maximum tardiness" (Q547127)

From MaRDI portal

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

4 July 2024

19 March 2024

5 March 2024

9 February 2024

30 January 2024

1 July 2023

22 June 2023