Revision history of "Improved NEH-based heuristic for the blocking flow-shop problem with bicriteria of the makespan and machine utilization" (Q6094862)

From MaRDI portal

Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.

3 August 2024

30 July 2024

10 July 2024

27 April 2024