Revision history of "Heuristics for the two-machine flowshop scheduling problem to minimize maximum lateness with bounded processing times" (Q611469)
From MaRDI portal
Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.