Revision history of "A note on two-machine no-wait flow shop scheduling with deteriorating jobs and machine availability constraints" (Q628666)
From MaRDI portal
Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.