Revision history of "Flow shop scheduling to minimize the total completion time with a permanently present operator: Models and ant colony optimization metaheuristic" (Q709121)
From MaRDI portal
Diff selection: Mark the radio buttons of the revisions to compare and hit enter or the button at the bottom.
Legend: (cur) = difference with latest revision, (prev) = difference with preceding revision, m = minor edit.