Pages that link to "Item:Q1771205"
From MaRDI portal
The following pages link to An application of a multi-objective tabu search algorithm to a bicriteria flowshop problem (Q1771205):
Displaying 8 items.
- An improved particle swarm optimization with decline disturbance index (DDPSO) for multi-objective job-shop scheduling problem (Q336962) (← links)
- Scheduling at coal handling facilities using simulated annealing (Q953296) (← links)
- A multi-objective iterated greedy search for flowshop scheduling with makespan and flowtime criteria (Q991843) (← links)
- Multi-objective integrated acyclic crew rostering and vehicle assignment problem in public bus transportation (Q1642066) (← links)
- Bi-objective parallel machine scheduling with additional resources during setups (Q2030593) (← links)
- A multi-objective model for environmental investment decision making (Q2384603) (← links)
- A bi-objective turning restriction design problem in urban road networks (Q2514872) (← links)
- Workload simulation and optimisation in multi-criteria hybrid flowshop scheduling: a case study (Q3055316) (← links)