Pages that link to "Item:Q1873005"
From MaRDI portal
The following pages link to The single-item lot-sizing problem with immediate lost sales (Q1873005):
Displaying 23 items.
- Constant approximation algorithms for the one warehouse multiple retailers problem with backlog or lost-sales (Q322424) (← links)
- Heuristics for the multi-item capacitated lot-sizing problem with lost sales (Q339577) (← links)
- Dynamic lot sizing for multiple products with a new joint replenishment model (Q418100) (← links)
- Satisfying market demands with delivery obligations or delivery charges (Q732911) (← links)
- Loss of customer goodwill in the uncapacitated lot-sizing problem (Q875427) (← links)
- Solving a multi-level capacitated lot sizing problem with multi-period setup carry-over via a fix-and-optimize heuristic (Q1010258) (← links)
- The multi-item capacitated lot-sizing problem with safety stocks and demand shortage costs (Q1025236) (← links)
- Single-item dynamic lot-sizing problems: an updated survey (Q1694825) (← links)
- Designing multi-period supply contracts in a two-echelon supply chain with asymmetric information (Q1737492) (← links)
- MIP formulations and heuristics for two-level production-transportation problems (Q1761227) (← links)
- Convex hull results for generalizations of the constant capacity single node flow set (Q2020609) (← links)
- Dynamic optimization for coordinated replenishment system considering seasonal demand and price quantity discount (Q2109608) (← links)
- Subcontracting and lot-sizing with constant capacities (Q2133416) (← links)
- A dynamic lot sizing model with production-or-outsourcing decision under minimum production quantities (Q2244219) (← links)
- The multi-item capacitated lot-sizing problem with setup times and shortage costs (Q2464221) (← links)
- Single item lot-sizing problem for a warm/cold process with immediate lost sales (Q2467270) (← links)
- Just-in-Time Planning and Lot-Sizing (Q2958674) (← links)
- Uncapacitated lot-sizing problem with production time windows, early productions, backlogs and lost sales (Q2997889) (← links)
- Grouping in decomposition method for multi-item capacitated lot-sizing problem with immediate lost sales and joint and item-dependent setup cost (Q3082694) (← links)
- New lot sizing heuristics for demand and price uncertainties with service-level constraint (Q3163778) (← links)
- Solving four-echelon integrated inventory model using a heuristic approach (Q3438307) (← links)
- Comparison of different approaches to multistage lot sizing with uncertain demand (Q6080612) (← links)
- A cash‐constrained dynamic lot‐sizing problem with loss of goodwill and credit‐based loan (Q6092619) (← links)