Pages that link to "Item:Q1926728"
From MaRDI portal
The following pages link to A mixed integer programming model for long term capacity expansion planning: a case study from the Hunter valley coal chain (Q1926728):
Displayed 10 items.
- An activity-based costing decision model for life cycle assessment in green building projects (Q296821) (← links)
- Multi-objective models and techniques for analysing the absolute capacity of railway networks (Q319616) (← links)
- Optimisation models for expanding a railway's theoretical capacity (Q322775) (← links)
- A decision support tool for generating shipping data for the Hunter Valley coal chain (Q337259) (← links)
- A new constraint programming approach for optimising a coal rail system (Q523170) (← links)
- Mathematical models for the berth allocation problem in dry bulk terminals (Q1707825) (← links)
- A branch and price algorithm to solve the integrated production planning and scheduling in bulk ports (Q1751727) (← links)
- A resource constrained scheduling problem with multiple independent producers and a single linking constraint: a coal supply chain example (Q2514747) (← links)
- Storage Yard Management: Modelling and Solving (Q5111125) (← links)
- Rail schedule optimisation in the hunter valley coal chain (Q5247704) (← links)