The following pages link to Gündüz Ulusoy (Q213382):
Displayed 18 items.
- Multi-project scheduling with two-stage decomposition (Q490148) (← links)
- The fleet size and mix problem for capacitated arc routing (Q1064973) (← links)
- A framework for an interactive project scheduling system under limited resources (Q1266550) (← links)
- A note on an iterative forward/backward scheduling technique with reference to a procedure by Li and Willis (Q1266705) (← links)
- A bicriteria two-machine permutation flowshop problem (Q1296104) (← links)
- Parallel machine scheduling with earliness and tardiness penalties (Q1304513) (← links)
- A robust strategy approach to a strategic mobility problem (Q1342065) (← links)
- A local constraint based analysis approach to project scheduling under general resource constraints (Q1342067) (← links)
- A genetic algorithm approach to the simultaneous scheduling of machines and automated guided vehicles (Q1373874) (← links)
- An equitable approach to the payment scheduling problem in project management (Q1590032) (← links)
- Resource portfolio problem under relaxed resource dedication policy in multi-mode multi-project scheduling (Q2205063) (← links)
- Multi-mode resource constrained multi-project scheduling and resource portfolio problem (Q2629594) (← links)
- Client‐contractor bargaining on net present value in project scheduling with limited resources (Q3621917) (← links)
- Heuristic Performance and Network/Resource Characteristics in Resource-constrained Project Scheduling (Q4206555) (← links)
- A constraint-based perspective in resource constrained project scheduling (Q4394226) (← links)
- Multiprocessor task scheduling in multistage hybrid flow-shops: a genetic algorithm approach (Q4661043) (← links)
- A Time Window Approach to Simultaneous Scheduling of Machines and Material Handling System in an FMS (Q4887728) (← links)
- Four payment models for the multi-mode resource constrained project scheduling problem with discounted cash flows (Q5948203) (← links)