Pages that link to "Item:Q2242185"
From MaRDI portal
The following pages link to An updated survey of variants and extensions of the resource-constrained project scheduling problem (Q2242185):
Displaying 14 items.
- A tree search heuristic for the resource constrained project scheduling problem with transfer times (Q2079399) (← links)
- Optimization Strategies for Resource-Constrained Project Scheduling Problems in Underground Mining (Q5060783) (← links)
- Application of idempotent algebra methods in genetic algorithm for solving the scheduling problem (Q5871445) (← links)
- R-SALSA: a branch, bound, and remember algorithm for the workload smoothing problem on simple assembly lines (Q6069213) (← links)
- New pseudo polynomial algorithms for a partial resource-constrained project scheduling problem (Q6102886) (← links)
- Literature reviews in operations research: a new taxonomy and a meta review (Q6106580) (← links)
- Project scheduling problem with fuzzy activity durations: a novel operational law based solution framework (Q6109248) (← links)
- Multi-project scheduling: a benchmark analysis of metaheuristic algorithms on various optimisation criteria and due dates (Q6112409) (← links)
- Resource-constrained multi-project scheduling problem: a survey (Q6112820) (← links)
- Tabu search for dedicated resource-constrained multiproject scheduling to minimise the maximal cash flow gap under uncertainty (Q6113306) (← links)
- MIP heuristics for a resource constrained project scheduling problem with workload stability constraints (Q6134060) (← links)
- A two‐layer approach for solving robust decentralized multiproject scheduling problem with multi‐skilled staff (Q6146634) (← links)
- Continuous-time formulations for multi-mode project scheduling (Q6164343) (← links)
- New resource-constrained project scheduling instances for testing (meta-)heuristic scheduling algorithms (Q6164372) (← links)