Pages that link to "Item:Q2271811"
From MaRDI portal
The following pages link to Scheduling jobs on a \(k\)-stage flexible flow-shop (Q2271811):
Displaying 13 items.
- Practical solutions for a dock assignment problem with trailer transportation (Q319870) (← links)
- Using the gravitational emulation local search algorithm to solve the multi-objective flexible dynamic job shop scheduling problem in small and medium enterprises (Q492824) (← links)
- An improved migrating birds optimisation for a hybrid flowshop scheduling with total flowtime minimisation (Q506145) (← links)
- Optimal solutions for a dock assignment problem with trailer transportation (Q744629) (← links)
- A bottleneck-based heuristic for minimizing makespan in a flexible flow line with unrelated parallel machines (Q1025264) (← links)
- Hybrid flexible flowshop problems: models and solution methods (Q1634549) (← links)
- Efficiency of the solution representations for the hybrid flow shop scheduling problem with makespan objective (Q2003565) (← links)
- Comments on ``Scheduling jobs on a \(k\)-stage flexible flow-shop'' [Annals of operations research (2008) 164: 29-40] (Q2267320) (← links)
- Scheduling jobs on a \(k\)-stage flexible flow-shop (Q2271811) (← links)
- Minimizing total completion time in the flexible flowshop sequence-dependent group scheduling problem (Q2341222) (← links)
- Review and classification of hybrid flow shop scheduling problems from a production system and a solutions procedure perspective (Q2379653) (← links)
- Effective constructive heuristics for distributed no-wait flexible flow shop scheduling problem (Q2669577) (← links)
- Two-stage hybrid flow shop with recirculation (Q3563625) (← links)