Pages that link to "Item:Q2342682"
From MaRDI portal
The following pages link to Preemptive scheduling on identical machines with delivery coordination to minimize the maximum delivery completion time (Q2342682):
Displayed 4 items.
- Minimizing maximum delivery completion time for order scheduling with rejection (Q830938) (← links)
- Parallel machine scheduling with the total weighted delivery time performance measure in distributed manufacturing (Q2026991) (← links)
- Unrelated parallel machine scheduling with eligibility constraints and delivery times to minimize total weighted tardiness (Q2108098) (← links)
- Two-stage scheduling on identical machines with assignable delivery times to minimize the maximum delivery completion time (Q5964074) (← links)