Pages that link to "Item:Q2359798"
From MaRDI portal
The following pages link to Two-agent scheduling problems on a single-machine to minimize the total weighted late work (Q2359798):
Displayed 17 items.
- Polynomial time approximation scheme for two parallel machines scheduling with a common due date to maximize early work (Q1673940) (← links)
- Two-agent preemptive Pareto-scheduling to minimize the number of tardy jobs and total late work (Q2025084) (← links)
- Single-machine Pareto-scheduling with multiple weighting vectors for minimizing the total weighted late works (Q2083387) (← links)
- Pareto-scheduling of two competing agents with their own equal processing times (Q2140187) (← links)
- A survey of due-date related single-machine with two-agent scheduling problem (Q2190270) (← links)
- Single-machine scheduling with multi-agents to minimize total weighted late work (Q2197329) (← links)
- Two competitive agents to minimize the weighted total late work and the total completion time (Q2243272) (← links)
- Fully polynomial time approximation scheme to maximize early work on parallel machines with common due date (Q2301935) (← links)
- A note on a two-agent scheduling problem related to the total weighted late work (Q2424661) (← links)
- Scheduling with competing agents, total late work and job rejection (Q2668778) (← links)
- A Branch-and-Bound Algorithm for Two-Agent Scheduling with Learning Effect and Late Work Criterion (Q4689397) (← links)
- Proportionate Flow Shop Scheduling with Two Competing Agents to Minimize Weighted Late Work and Weighted Number of Late Jobs (Q5012893) (← links)
- Pareto‐optimization of three‐agent scheduling to minimize the total weighted completion time, weighted number of tardy jobs, and total weighted late work (Q6076476) (← links)
- Pareto‐scheduling with double‐weighted jobs to minimize the weighted number of tardy jobs and total weighted late work (Q6077487) (← links)
- Two-agent single-machine scheduling with release dates to minimize the makespan (Q6081603) (← links)
- Two-agent single-machine scheduling with a rate-modifying activity (Q6087481) (← links)
- Single-machine preemptive scheduling with release dates involving the total weighted late work criterion (Q6093999) (← links)