Pages that link to "Item:Q2424794"
From MaRDI portal
The following pages link to Minmax scheduling problems with common due-date and completion time penalty (Q2424794):
Displayed 8 items.
- Single machine lot scheduling with optional job-rejection (Q2025088) (← links)
- Minmax common flow-allowance problems with convex resource allocation and position-dependent workloads (Q2075458) (← links)
- Single-machine due-date assignment scheduling with generalized earliness-tardiness penalties including proportional setup times (Q2142501) (← links)
- A note on the single machine CON and CONW problems with lot scheduling (Q2230735) (← links)
- Solving integrated process planning, dynamic scheduling, and due date assignment using metaheuristic algorithms (Q2298093) (← links)
- Polynomial time algorithm for minmax scheduling with common due-window and proportional-linear shortening processing times (Q2688577) (← links)
- Approaches to Solving Scheduling with Due-Window Assignment and Deterioration Effects (Q6053522) (← links)
- Common due-window assignment and minmax scheduling with resource allocation and group technology on a single machine (Q6094568) (← links)