Pages that link to "Item:Q2456645"
From MaRDI portal
The following pages link to A branch and bound algorithm for an identical parallel machine scheduling problem with a job splitting property (Q2456645):
Displaying 10 items.
- Two meta-heuristics for parallel machine scheduling with job splitting to minimize total tardiness (Q639194) (← links)
- Batch sizing and just-in-time scheduling with common due date (Q744646) (← links)
- Planning production using mathematical programming: The case of a woodturning company (Q1013389) (← links)
- Scheduling with job-splitting considering learning and the vital-few law (Q1652529) (← links)
- Two branch-and-bound algorithms for the robust parallel machine scheduling problem (Q1762154) (← links)
- A branch and bound algorithm for hybrid flow shop scheduling problem with setup time and assembly operations (Q1991311) (← links)
- Scheduling uniform parallel dedicated machines with job splitting, sequence-dependent setup times, and multiple servers (Q2026982) (← links)
- A vibration damping optimization algorithm for a parallel machines scheduling problem with sequence-independent family setup times (Q2285809) (← links)
- Minimisation of total tardiness for identical parallel machine scheduling using genetic algorithm (Q2403558) (← links)
- A Multiobjective Optimization Approach to Solve a Parallel Machines Scheduling Problem (Q3083901) (← links)