Pages that link to "Item:Q2482793"
From MaRDI portal
The following pages link to A genetic algorithm for the resource constrained multi-project scheduling problem (Q2482793):
Displayed 10 items.
- A multi-population hybrid biased random key genetic algorithm for hop-constrained trees in nonlinear cost flow networks (Q360513) (← links)
- Statistical design of genetic algorithms for combinatorial optimization problems (Q410570) (← links)
- Resource allocation in dynamic PERT networks with finite capacity (Q420887) (← links)
- A \((\mu ,\, \lambda )\)-coordination mechanism for agent-based multi-project scheduling (Q421082) (← links)
- Simplifying multiproject scheduling problem based on design structure matrix and its solution by an improved aiNet algorithm (Q444285) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- GEM: A novel evolutionary optimization method with improved neighborhood search (Q1021529) (← links)
- A priority-rule method for project scheduling with work-content constraints (Q1046055) (← links)
- A parallel multi-population biased random-key genetic algorithm for a container loading problem (Q1761962) (← links)
- Biased random-key genetic algorithms with applications in telecommunications (Q1935883) (← links)