Pages that link to "Item:Q2629988"
From MaRDI portal
The following pages link to Parallel-machine scheduling to minimize makespan with fuzzy processing times and learning effects (Q2629988):
Displaying 15 items.
- A two-stage resource allocation model for lifeline systems quick response with vulnerability analysis (Q322575) (← links)
- Permutation flowshop problems with bi-criterion makespan and total completion time objective and position-weighted learning effects (Q337503) (← links)
- Single machine group scheduling with time dependent processing times and ready times (Q726558) (← links)
- Research on scheduling problems with general effects of deterioration and learning (Q1749104) (← links)
- An adaptive robust optimization model for parallel machine scheduling (Q2106719) (← links)
- Branch-and-price approach for robust parallel machine scheduling with sequence-dependent setup times (Q2140270) (← links)
- Patient scheduling with deteriorating treatment duration and maintenance activity (Q2156900) (← links)
- A new model and algorithm for uncertain random parallel machine scheduling problem (Q2318555) (← links)
- Exact and matheuristic methods for the parallel machine scheduling and location problem with delivery time and due date (Q2676340) (← links)
- Polynomial time algorithm for minmax scheduling with common due-window and proportional-linear shortening processing times (Q2688577) (← links)
- Multi-objective dynamic fuzzy scheduling and its algorithm in product collaborative design considering emergency (Q2988474) (← links)
- (Q5034201) (← links)
- (Q5125441) (← links)
- Multiobjective pseudo‐variable neighborhood descent for a bicriteria parallel machine scheduling problem with setup time (Q6090472) (← links)
- Bi-Objective Flow Shop Scheduling with Equipotential Parallel Machines (Q6193885) (← links)