The following pages link to Yuan-Jye Tseng (Q2997956):
Displaying 8 items.
- Integrated multi-plants and supply chain system with minimizing total cost in collaboration manufacturing environments (Q2997957) (← links)
- Integrated assembly and disassembly sequence planning using a GA approach (Q3163150) (← links)
- A particle swarm optimisation algorithm for multi-plant assembly sequence planning with integrated assembly sequence planning and plant assignment (Q3163305) (← links)
- Optimization of multi-plants and SCM strategies with Lagrangian relaxation model (Q3633872) (← links)
- Optimization of multi-plants design strategies with fuzzy reliability model in collaboration manufacture (Q3633873) (← links)
- Concurrent analysis of machining sequences and fixturing set-ups for minimizing set-up changes for machining mill-turn parts (Q4443349) (← links)
- Evaluation of alternative tolerance allocations for multiple machining sequences with geometric tolerances (Q4497168) (← links)
- Three dimensional biarc approximation of freeform surfaces for machining tool path generation (Q4497210) (← links)