Pages that link to "Item:Q3055422"
From MaRDI portal
The following pages link to Using simulated annealing to schedule a flowshop manufacturing cell with sequence-dependent family setup times (Q3055422):
Displayed 8 items.
- The third comprehensive survey on scheduling problems with setup times/costs (Q319774) (← links)
- Optimizing of bullwhip effect and net stock amplification in three-echelon supply chains using evolutionary multi-objective metaheuristics (Q324324) (← links)
- Effect of solution representations on tabu search in scheduling applications (Q336636) (← links)
- Flow shop batching and scheduling with sequence-dependent setup times (Q490328) (← links)
- A comprehensive review of flowshop group scheduling literature (Q1651625) (← links)
- Family scheduling with batch availability in flow shops to minimize makespan (Q1743654) (← links)
- A simulation-optimization model for solving flexible flow shop scheduling problems with rework and transportation (Q1998264) (← links)
- APPLYING SIMULATED ANNEALING TO A GENERALIZED CELL FORMATION PROBLEM CONSIDERING ALTERNATIVE ROUTINGS AND MACHINE RELIABILITY (Q2931717) (← links)