Pages that link to "Item:Q3156721"
From MaRDI portal
The following pages link to One-operator, two-machine open shop and flow shop problems with setup times for machines and weighted number of tardy jobs objective (Q3156721):
Displayed 6 items.
- A job-shop problem with one additional resource type (Q640303) (← links)
- Flow shop scheduling to minimize the total completion time with a permanently present operator: Models and ant colony optimization metaheuristic (Q709121) (← links)
- Scheduling with batching: A review (Q1969826) (← links)
- Minimizing the weighted number of tardy jobs on multiple machines: a review (Q2358307) (← links)
- A survey of scheduling problems with setup times or costs (Q2467249) (← links)
- Two-machine open shop problem with a single server and set-up time considerations (Q2663040) (← links)