Pages that link to "Item:Q3159643"
From MaRDI portal
The following pages link to Advanced planning and scheduling based on precedence and resource constraints for e-plant chains (Q3159643):
Displaying 6 items.
- A mixed integer programming model for advanced planning and scheduling (APS) (Q872302) (← links)
- Solving composite scheduling problems using the hybrid genetic algorithm (Q1622412) (← links)
- Operational extended model formulations for advanced planning and scheduling systems (Q1991314) (← links)
- A constraint programming method for advanced planning and scheduling system with multilevel structured products (Q2321546) (← links)
- Multiobjective particle swarm optimization with direction search and differential evolution for distributed flow-shop scheduling problem (Q2688574) (← links)
- A Constraint Satisfaction Coordination Approach for Distributed Supply Chain Production Planning (Q5174411) (← links)