The following pages link to Paz Perez-Gonzalez (Q319783):
Displaying 8 items.
- On heuristic solutions for the stochastic flowshop scheduling problem (Q319784) (← links)
- From competitive to collaborative supply networks: a simulation study (Q534864) (← links)
- Setting a common due date in a constrained flowshop: a variable neighbourhood search approach (Q976037) (← links)
- Scheduling permutation flowshops with initial availability constraint: Analysis of solutions and constructive heuristics (Q1017464) (← links)
- Deterministic assembly scheduling problems: a review and classification of concurrent-type scheduling models and solution procedures (Q1622791) (← links)
- The 2-stage assembly flowshop scheduling problem with total completion time: efficient constructive heuristic and metaheuristic (Q1651546) (← links)
- New approximate algorithms for the customer order scheduling problem with total completion time objective (Q1652070) (← links)
- Order scheduling with tardiness objective: improved approximate solutions (Q1754153) (← links)