Pages that link to "Item:Q326478"
From MaRDI portal
The following pages link to Scheduling two job families on a single machine with two competitive agents (Q326478):
Displaying 3 items.
- Proportionate flow shop scheduling with multi-agents to maximize total gains of JIT jobs (Q1640602) (← links)
- Two-agent scheduling on a bounded parallel-batching machine with makespan and maximum lateness objectives (Q2176838) (← links)
- Serial-batching scheduling with two agents to minimize makespan and maximum cost (Q2215193) (← links)