The following pages link to (Q3609943):
Displayed 3 items.
- Minimizing makespan in two-stage hybrid cross docking scheduling problem (Q1001000) (← links)
- A multiobjective mathematical model for truck scheduling problem in multidoor cross-docking system (Q2169336) (← links)
- A genetic algorithm to minimize the makespan in a two-machine cross-docking flow shop problem (Q2223269) (← links)