Pages that link to "Item:Q363555"
From MaRDI portal
The following pages link to MineLib: a library of open pit mining problems (Q363555):
Displayed 23 items.
- MineLib (Q19499) (← links)
- Aggregation heuristic for the open-pit block scheduling problem (Q321137) (← links)
- Tailored Lagrangian relaxation for the open pit block sequencing problem (Q490234) (← links)
- Comparative analysis of three metaheuristics for short-term open pit block sequencing (Q525065) (← links)
- A hybrid method based on linear programming and variable neighborhood descent for scheduling production in open-pit mines (Q887202) (← links)
- Optimizing high-level nuclear waste disposal within a deep geologic repository (Q1695772) (← links)
- A study of the Bienstock-Zuckerberg algorithm: applications in mining and resource constrained project scheduling (Q1744895) (← links)
- A local branching heuristic for the open pit mine production scheduling problem (Q1752798) (← links)
- Linear models for stockpiling in open-pit mine production scheduling problems (Q1753425) (← links)
- Combined optimisation of an open-pit mine outline and the transition depth to underground mining (Q1754360) (← links)
- A recursive time aggregation-disaggregation heuristic for the multidimensional and multiperiod precedence-constrained knapsack problem: an application to the open-pit mine block sequencing problem (Q2160495) (← links)
- Solution procedures for block selection and sequencing in flat-bedded potash underground mines (Q2241902) (← links)
- MIRPLib -- a library of maritime inventory routing problem instances: survey, core model, and benchmark results (Q2256276) (← links)
- A new model for automated pushback selection (Q2289883) (← links)
- Evolutionary approach for large-scale mine scheduling (Q2663534) (← links)
- Hierarchical Benders Decomposition for Open-Pit Mine Block Sequencing (Q2830758) (← links)
- A Decomposition-Based Heuristic for Collaborative Scheduling in a Network of Open-Pit Mines (Q2940058) (← links)
- Optimization Strategies for Resource-Constrained Project Scheduling Problems in Underground Mining (Q5060783) (← links)
- A real-world mine excavators timetabling methodology in open-pit mining (Q6050355) (← links)
- Optimal control approaches for open pit planning (Q6088562) (← links)
- An efficient method for optimizing nested open pits with operational bottom space (Q6146633) (← links)
- A model for open-pit pushback design with operational constraints (Q6159500) (← links)
- Short-term open-pit production scheduling optimizing multiple objectives accounting for shovel allocation in stockpiles (Q6159503) (← links)