Pages that link to "Item:Q3783807"
From MaRDI portal
The following pages link to Two heuristics for the economic lot scheduling problem: An experimental study (Q3783807):
Displayed 6 items.
- The economic lot scheduling problem under extended basic period and power-of-two policy (Q968005) (← links)
- A job-splitting heuristic for lot-size scheduling in multi-stage, multi- product production processes (Q1331612) (← links)
- The economic lot scheduling problem without capacity constraints (Q1772974) (← links)
- Solving the economic lot scheduling problem with multiple facilities in parallel using the time-varying lot sizes approach (Q3008607) (← links)
- The economic lot scheduling problem under power-of-two policy (Q5948793) (← links)
- The peak load minimization problem in cyclic production (Q5955976) (← links)