Pages that link to "Item:Q4443305"
From MaRDI portal
The following pages link to An AGV routing policy reflecting the current and future state of semiconductor and LCD production lines (Q4443305):
Displaying 5 items.
- Vehicle dispatching for highly loaded semiconductor production considering bottleneck machines first (Q853750) (← links)
- An analysis of the ceiling height requirement for a large-scale semiconductor fab (Q3163284) (← links)
- Performance evaluation of dynamic scheduling approaches in vehicle-based internal transport systems (Q3168926) (← links)
- Effective overhead hoist transport dispatching based on the Hungarian algorithm for a large semiconductor FAB (Q3636769) (← links)
- Effectiveness of vehicle reassignment in a large-scale overhead hoist transport system (Q5444461) (← links)