Pages that link to "Item:Q4474693"
From MaRDI portal
The following pages link to Non-identical parallel CNC machine scheduling (Q4474693):
Displayed 6 items.
- Job scheduling and management of wearing tools with stochastic tool lifetimes (Q955695) (← links)
- A Lagrangean-based heuristic for multi-plant, multi-item, multi-period capacitated lot-sizing problems with inter-plant transfers (Q1886858) (← links)
- The general two-level storage management problem: a reconsideration of the KTNS-rule (Q2576258) (← links)
- A part-and-tool assignment method for the workload-balance between machines and the minimisation of tool-shortage occurrences in an FMS (Q4681148) (← links)
- A methodology for cutting-tool management through the integration of CAPP and scheduling (Q5385471) (← links)
- Due date and cost-based FMS loading, scheduling and tool management (Q5444486) (← links)