Pages that link to "Item:Q5322091"
From MaRDI portal
The following pages link to An Efficient Optimal Solution to the Two-Hoist No-Wait Cyclic Scheduling Problem (Q5322091):
Displayed 10 items.
- Multi-degree cyclic flow shop robotic cell scheduling problem: ant colony optimization (Q342414) (← links)
- A polynomial algorithm for multi-robot 2-cyclic scheduling in a no-wait robotic cell (Q632670) (← links)
- Optimal scheduling of material handling devices in a PCB production line: problem formulation and a polynomial algorithm (Q955949) (← links)
- Scheduling of a single crane in batch annealing process (Q1017463) (← links)
- Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots (Q1042101) (← links)
- Multiple crane scheduling in a batch annealing process with no-delay constraints for machine unloading (Q2293995) (← links)
- Cyclic flowshop scheduling with operators and robots: Vyacheslav Tanaev's vision and lasting contributions (Q2434294) (← links)
- Optimising the Slab Yard Planning and Crane Scheduling Problem using a two-stage heuristic (Q3163219) (← links)
- AN EFFICIENT OPTIMAL SOLUTION OF A TWO-CRANE SCHEDULING PROBLEM (Q3632031) (← links)
- Mixed-integer linear programming method for multi-degree and multi-hoist cyclic scheduling with time windows (Q5058816) (← links)