Pages that link to "Item:Q5471126"
From MaRDI portal
The following pages link to Minimizing the makespan in open‐shop scheduling problems with a convex resource consumption function (Q5471126):
Displaying 6 items.
- A tabu-search algorithm for scheduling jobs with controllable processing times on a single machine to meet due-dates (Q976008) (← links)
- Controllable processing times in project and production management: analysing the trade-off between processing times and the amount of resources (Q1666672) (← links)
- Complexity and approximation of open shop scheduling to minimize the makespan: a review of models and approaches (Q2147068) (← links)
- Four decades of research on the open-shop scheduling problem to minimize the makespan (Q2239884) (← links)
- A survey of scheduling with controllable processing times (Q2381529) (← links)
- A branch and bound algorithm for scheduling jobs with controllable processing times on a single machine to meet due dates (Q2430605) (← links)