Pages that link to "Item:Q552115"
From MaRDI portal
The following pages link to Solving the vendor-buyer integrated inventory system with arithmetic-geometric inequality (Q552115):
Displayed 16 items.
- A three layer supply chain model with multiple suppliers, manufacturers and retailers for multiple items (Q530020) (← links)
- A supplement to ``Using the EPQ for coordinated planning of a product with partial backordering and its components'' (Q646156) (← links)
- Economic order quantity model for deteriorating items with planned backorder level (Q652886) (← links)
- A production-inventory model with probabilistic deterioration in two-echelon supply chain management (Q727324) (← links)
- Backlogging EOQ model for promotional effort and selling price sensitive demand- an intuitionistic fuzzy approach (Q889523) (← links)
- A constrained multi-products EPQ inventory model with discrete delivery order and lot size (Q1644072) (← links)
- An interpolating by pass to Pareto optimality in intuitionistic fuzzy technique for a EOQ model with time sensitive backlogging (Q1644110) (← links)
- An improved solution to the replenishment policy for the EMQ model with rework and multiple shipments (Q1667850) (← links)
- Optimal pricing of competing retailers under uncertain demand -- a two layer supply chain model (Q1703570) (← links)
- Solving a finite horizon EPQ problem with backorders (Q1789475) (← links)
- Note on ``The derivation of EOQ/EPQ inventory models with two backorders costs using analytic geometry and algebra'' (Q1984959) (← links)
- An analysis of production-inventory models with deteriorating items in a two-echelon supply chain (Q1991463) (← links)
- Optimal economic order quantity for buyer–distributor–vendor supply chain with backlogging derived without derivatives (Q2873099) (← links)
- (Q4562748) (← links)
- Quantity discount for integrated supply chain model with back order and controllable deterioration rate (Q4987792) (← links)
- (Q5860585) (← links)