Pages that link to "Item:Q5948203"
From MaRDI portal
The following pages link to Four payment models for the multi-mode resource constrained project scheduling problem with discounted cash flows (Q5948203):
Displayed 21 items.
- Scheduling multi-mode projects under uncertainty to optimize cash flows: a Monte Carlo ant colony system approach (Q389025) (← links)
- Project scheduling with finite or infinite number of activity processing modes -- a survey (Q621683) (← links)
- Discrete-continuous project scheduling with discounted cash inflows and various payment models -- a review of recent results (Q744660) (← links)
- A genetic algorithm for resource investment problem with discounted cash flows (Q865553) (← links)
- Knowledge integration using problem spaces: A study in resource-constrained project scheduling (Q880537) (← links)
- A survey of variants and extensions of the resource-constrained project scheduling problem (Q992569) (← links)
- A parameter-tuned genetic algorithm for the resource investment problem with discounted cash flows and generalized precedence relations (Q1025246) (← links)
- A priority rule-based heuristic for resource investment project scheduling problem with discounted cash flows and tardiness penalties (Q1036260) (← links)
- Simulated annealing and tabu search for multi-mode project payment scheduling (Q1042041) (← links)
- Variable neighbourhood search and tabu search for a discrete time/cost trade-off problem to minimize the maximal cash flow gap (Q1652132) (← links)
- An applicable method for modifying over-allocated multi-mode resource constraint schedules in the presence of preemptive resources (Q1698276) (← links)
- An integer programming formulation for the project scheduling problem with irregular time-cost tradeoffs (Q1762128) (← links)
- Simulated annealing and tabu search for multi-mode resource-constrained project scheduling with positive discounted cash flows and different payment models (Q1767683) (← links)
- Multi-objective multi-mode resource constrained project scheduling problem using Pareto-based algorithms (Q2218447) (← links)
- Considering project management activities for engineering design groups (Q2226486) (← links)
- Metaheuristics for multi-mode capital-constrained project payment scheduling (Q2253378) (← links)
- Project selection, scheduling and resource allocation with time dependent returns (Q2519075) (← links)
- A lexicographic approach to the robust resource-constrained project scheduling problem (Q2968494) (← links)
- Evolutionary algorithms applied to project scheduling problems—a survey of the state-of-the-art (Q3432703) (← links)
- Client‐contractor bargaining on net present value in project scheduling with limited resources (Q3621917) (← links)
- Information advantage and payment disadvantage when selling goods through a powerful retailer (Q6148728) (← links)