Pages that link to "Item:Q6039349"
From MaRDI portal
The following pages link to One-Operator, Two-Machine Open Shop And Flow Shop Scheduling With Setup Times For Machines And Maximum Lateness Objective (Q6039349):
Displayed 3 items.
- Flow shop scheduling to minimize the total completion time with a permanently present operator: Models and ant colony optimization metaheuristic (Q709121) (← links)
- A survey of scheduling problems with setup times or costs (Q2467249) (← links)
- Two-machine open shop problem with a single server and set-up time considerations (Q2663040) (← links)