Pages that link to "Item:Q713105"
From MaRDI portal
The following pages link to The impact of stochastic lead time reduction on inventory cost under order crossover (Q713105):
Displayed 18 items.
- Inventory management for stochastic lead times with order crossovers (Q320703) (← links)
- Investing in lead-time variability reduction in a collaborative vendor-buyer supply chain model with stochastic lead time (Q342365) (← links)
- Inventory model with fuzzy lead-time and dynamic demand over finite time horizon using a multi-objective genetic algorithm (Q356061) (← links)
- Analysis of production and inventory systems when orders may cross over (Q499322) (← links)
- Analysis of lead time correlation under a base-stock policy (Q666961) (← links)
- Mixture inventory model of lost sale and back-order with stochastic lead time demand on permissible delay in payments (Q827122) (← links)
- Decision of lead-time compression and stable operation of supply chain (Q1694237) (← links)
- Measurement and optimization of responsiveness in supply chain networks with queueing structures (Q1694322) (← links)
- Diversity of payment contracts in a decentralized assembly system (Q1699191) (← links)
- Mitigating variance amplification under stochastic lead-time: the proportional control approach (Q1752181) (← links)
- An optimal control of inventory under probablistic replenishment intervals and known price increase (Q1752864) (← links)
- Coordinating supply chains with stochastic demand by crashing lead times (Q1782200) (← links)
- An EOQ model with breakable items considering stock dependent demand and lead time dependent credit period (Q2114456) (← links)
- The effect of delivery deviations on the choice of a supplier and the supply-chain equilibrium (Q2306783) (← links)
- A stochastic periodic review inventory model with back-order discounts and ordering cost dependent on lead time for the mixtures of distributions (Q2355007) (← links)
- A manufacturer-buyers integrated inventory model with generic distribution of lead times to deliver equal and/or unequal batch sizes (Q2664401) (← links)
- Optimal lot-sizing policy for a failure prone production system with investment in process quality improvement and lead time variance reduction (Q2673400) (← links)
- Replenishment strategies for lost sales inventory systems of perishables under demand and lead time uncertainty (Q6167538) (← links)