Pages that link to "Item:Q879282"
From MaRDI portal
The following pages link to Simultaneous optimization of classical objectives in JIT scheduling (Q879282):
Displayed 4 items.
- Solving symmetric mixed-model multi-level just-in-time scheduling problems (Q968134) (← links)
- The product rate variation problem and its relevance in real world mixed-model assembly lines (Q1015006) (← links)
- The multi-objective assembly line worker integration and balancing problem of type-2 (Q1652274) (← links)
- (Q3388238) (← links)