Pages that link to "Item:Q958563"
From MaRDI portal
The following pages link to Multivariate Bayesian process control for a finite production run (Q958563):
Displayed 11 items.
- A simulation-based multivariate Bayesian control chart for real time condition-based maintenance of complex systems (Q439579) (← links)
- New indices for the evaluation of the statistical properties of Bayesian \(\overline{x}\) control charts for short runs (Q1751809) (← links)
- A Bayesian model and numerical algorithm for CBM availability maximization (Q1761824) (← links)
- Multivariate Bayesian control chart based on economic-statistical design with 2 and 3-variable sample size (Q2019681) (← links)
- Multivariate Bayesian control chart based on economic-statistical design with 2- and 3-variable sample size (Q2121908) (← links)
- Optimal Bayesian fault prediction scheme for a partially observable system subject to random failure (Q2275824) (← links)
- Availability maximization under partial observations (Q2393123) (← links)
- Multistate Bayesian Control Chart Over a Finite Horizon (Q3465596) (← links)
- Evaluation of CUSUM Charts for Finite-Horizon Processes (Q3577181) (← links)
- Economic and economic–statistical designs of VSI Bayesian control chart using Monte Carlo method and ABC algorithm (Q5106818) (← links)
- Optimisation of fully adaptive Bayesian charts for infinite-horizon processes (Q5172439) (← links)