Pages that link to "Item:Q975447"
From MaRDI portal
The following pages link to An improved particle swarm optimization algorithm for flowshop scheduling problem (Q975447):
Displayed 6 items.
- Genetic based discrete particle swarm optimization for elderly day care center timetabling (Q342133) (← links)
- Reducing network and computation complexities in neural based real-time scheduling scheme (Q632870) (← links)
- Optimizing version release dates of research and development long-term processes (Q1751861) (← links)
- A new vision of approximate methods for the permutation flowshop to minimise makespan: state-of-the-art and computational evaluation (Q1752855) (← links)
- An improved particle swarm optimization algorithm to solve hybrid flowshop scheduling problems with the effect of human factors -- a case study (Q2337384) (← links)
- Schedule generation scheme for solving multi-mode resource availability cost problem by modified particle swarm optimization (Q2356121) (← links)