Scheduling with neural networks: Application to timetable construction (Q1336784): Difference between revisions

From MaRDI portal
RedirectionBot (talk | contribs)
Removed claim: author (P16): Item:Q807065
Set OpenAlex properties.
 
(2 intermediate revisions by 2 users not shown)
Property / author
 
Property / author: Jeanny Herault / rank
 
Normal rank
Property / MaRDI profile type
 
Property / MaRDI profile type: MaRDI publication profile / rank
 
Normal rank
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/0925-2312(94)90020-5 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W2019176734 / rank
 
Normal rank

Latest revision as of 22:52, 19 March 2024

scientific article
Language Label Description Also known as
English
Scheduling with neural networks: Application to timetable construction
scientific article

    Statements

    Scheduling with neural networks: Application to timetable construction (English)
    0 references
    0 references
    0 references
    3 November 1994
    0 references
    0 references
    disjunctive constraints
    0 references
    backward lateral inhibitions
    0 references
    timetable construction
    0 references
    resource allocation constraints
    0 references
    NP-complete
    0 references
    neural network model
    0 references
    0 references