Joint determination of production quantity, inspection schedule, and quality control for an imperfect process with deteriorating products (Q4658527): Difference between revisions
From MaRDI portal
Set profile property. |
Set OpenAlex properties. |
||
Property / full work available at URL | |||
Property / full work available at URL: https://doi.org/10.1057/palgrave.jors.2601238 / rank | |||
Normal rank | |||
Property / OpenAlex ID | |||
Property / OpenAlex ID: W2070129728 / rank | |||
Normal rank |
Latest revision as of 23:49, 19 March 2024
scientific article; zbMATH DE number 2146787
Language | Label | Description | Also known as |
---|---|---|---|
English | Joint determination of production quantity, inspection schedule, and quality control for an imperfect process with deteriorating products |
scientific article; zbMATH DE number 2146787 |
Statements
Joint determination of production quantity, inspection schedule, and quality control for an imperfect process with deteriorating products (English)
0 references
16 March 2005
0 references
economic production quantity
0 references
economic design of control charts
0 references
deteriorating process
0 references
deteriorating product
0 references