Two-machine shop scheduling problems with batch processing (Q1802481): Difference between revisions

From MaRDI portal
Import240304020342 (talk | contribs)
Set profile property.
ReferenceBot (talk | contribs)
Changed an Item
 
(One intermediate revision by one other user not shown)
Property / full work available at URL
 
Property / full work available at URL: https://doi.org/10.1016/0895-7177(93)90196-6 / rank
 
Normal rank
Property / OpenAlex ID
 
Property / OpenAlex ID: W1997499543 / rank
 
Normal rank
Property / cites work
 
Property / cites work: Batching to Minimize Flow Times on One Machine / rank
 
Normal rank
Property / cites work
 
Property / cites work: On the Complexity of Scheduling with Batch Setup Times / rank
 
Normal rank
Property / cites work
 
Property / cites work: One-pass batching algorithms for the one-machine problem / rank
 
Normal rank
Property / cites work
 
Property / cites work: Open Shop Scheduling to Minimize Finish Time / rank
 
Normal rank

Latest revision as of 16:16, 17 May 2024

scientific article
Language Label Description Also known as
English
Two-machine shop scheduling problems with batch processing
scientific article

    Statements

    Two-machine shop scheduling problems with batch processing (English)
    0 references
    0 references
    21 July 1993
    0 references
    The considered problem is concerned with two machine shop scheduling problems. Jobs are divided into groups and set up times are to be added whenever two jobs of different groups are processed consecutively on the same machine. The problems of minimizing makespan for the flow and open shop are proved to be NP-hard.
    0 references
    flow shop
    0 references
    batch processing complexity
    0 references
    two machine shop scheduling
    0 references
    makespan
    0 references
    NP-hard
    0 references

    Identifiers